Changeset 5139


Ignore:
Timestamp:
10/20/11 21:49:07 (3 years ago)
Author:
jwatson
Message:

Fixing PySP CPLEX test baselines, accounting for verbose output enhancements.

Location:
coopr.pysp/trunk/coopr/pysp/tests/unit
Files:
4 edited

Legend:

Unmodified
Added
Removed
  • coopr.pysp/trunk/coopr/pysp/tests/unit/farmer_quadratic_basic_bundling_cplex.baseline

    r5036 r5139  
    132132Data for scenario=AboveAverageScenario loads from file=/home/jwatson/sp/coopr/src/coopr.pysp/examples/pysp/farmer/scenariodataWithTwoBundles/AboveAverageScenario.dat 
    133133Creating weight, average, and rho parameter vectors for scenario instances 
     134Preprocessing scenario instances 
    134135Creating variable statistic (min/avg/max) parameter vectors for scenario tree nodes 
    135136Total number of discrete instance variables=0 
     
    992993---------------------------------------------------- 
    993994 
    994 Total PH execution time=    0.75 seconds 
    995  
     995Total PH execution time=0.80 seconds 
     996 
     997Total execution time=0.80 seconds 
  • coopr.pysp/trunk/coopr/pysp/tests/unit/farmer_quadratic_trivial_bundling_cplex.baseline

    r5036 r5139  
    136136Data for scenario=AboveAverageScenario loads from file=/home/jwatson/sp/coopr/src/coopr.pysp/examples/pysp/farmer/scenariodataWithTrivialBundles/AboveAverageScenario.dat 
    137137Creating weight, average, and rho parameter vectors for scenario instances 
     138Preprocessing scenario instances 
    138139Creating variable statistic (min/avg/max) parameter vectors for scenario tree nodes 
    139140Total number of discrete instance variables=0 
     
    19341935---------------------------------------------------- 
    19351936 
    1936 Total PH execution time=    2.35 seconds 
    1937  
     1937Total PH execution time=2.58 seconds 
     1938 
     1939Total execution time=2.58 seconds 
  • coopr.pysp/trunk/coopr/pysp/tests/unit/farmer_quadratic_verbose_cplex.baseline

    r5036 r5139  
    122122Data for scenario=AboveAverageScenario loads from file=/home/jwatson/sp/coopr/src/coopr.pysp/examples/pysp/farmer/scenariodata/AboveAverageScenario.dat 
    123123Creating weight, average, and rho parameter vectors for scenario instances 
     124Preprocessing scenario instances 
    124125Creating variable statistic (min/avg/max) parameter vectors for scenario tree nodes 
    125126Total number of discrete instance variables=0 
     
    19281929---------------------------------------------------- 
    19291930 
    1930 Total PH execution time=    2.02 seconds 
    1931  
     1931Total PH execution time=2.32 seconds 
     1932 
     1933Total execution time=2.32 seconds 
  • coopr.pysp/trunk/coopr/pysp/tests/unit/sizes3_quadratic_cplex.baseline

    r5123 r5139  
    1414Convergence metric=      0.0644  First stage cost avg= 163123.9867  Max-Min=   51.24 
    1515Initiating PH iteration=4 
    16 Convergence metric=      0.0349  First stage cost avg= 163064.0195  Max-Min=  484.54 
     16Convergence metric=      0.0348  First stage cost avg= 163063.7597  Max-Min=  485.32 
    1717Initiating PH iteration=5 
    18 Convergence metric=      0.0963  First stage cost avg= 163077.7904  Max-Min=  198.89 
     18Convergence metric=      0.0963  First stage cost avg= 163077.5445  Max-Min=  198.90 
    1919Initiating PH iteration=6 
    20 Convergence metric=      0.0103  First stage cost avg= 163096.1915  Max-Min=  218.64 
     20Convergence metric=      0.0103  First stage cost avg= 163096.2245  Max-Min=  219.51 
    2121Initiating PH iteration=7 
    22 Convergence metric=      0.0072  First stage cost avg= 163062.5973  Max-Min=  347.39 
     22Convergence metric=      0.0072  First stage cost avg= 163062.6547  Max-Min=  347.48 
    2323Initiating PH iteration=8 
    24 Convergence metric=      0.0067  First stage cost avg= 163032.8037  Max-Min=  347.39 
     24Convergence metric=      0.0067  First stage cost avg= 163032.5771  Max-Min=  347.48 
    2525Initiating PH iteration=9 
    26 Convergence metric=      0.0084  First stage cost avg= 163106.9261  Max-Min=  442.01 
     26Convergence metric=      0.0084  First stage cost avg= 163105.0475  Max-Min=  443.52 
    2727Initiating PH iteration=10 
    28 Convergence metric=      0.0082  First stage cost avg= 163166.2779  Max-Min=  442.01 
     28Convergence metric=      0.0083  First stage cost avg= 163163.5584  Max-Min=  443.52 
    2929Initiating PH iteration=11 
    30 Convergence metric=      0.0289  First stage cost avg= 163165.0451  Max-Min=  216.78 
     30Convergence metric=      0.0289  First stage cost avg= 163162.0685  Max-Min=  221.67 
    3131Initiating PH iteration=12 
    32 Convergence metric=      0.0265  First stage cost avg= 163117.6877  Max-Min=  137.61 
     32Convergence metric=      0.0269  First stage cost avg= 163114.0403  Max-Min=  140.43 
    3333Initiating PH iteration=13 
    34 Convergence metric=      0.0021  First stage cost avg= 163060.3715  Max-Min=   59.93 
     34Convergence metric=      0.0315  First stage cost avg= 163082.7963  Max-Min=  140.43 
    3535Initiating PH iteration=14 
    36 Convergence metric=      0.0116  First stage cost avg= 163092.9773  Max-Min=  182.33 
     36Convergence metric=      0.0266  First stage cost avg= 163150.0627  Max-Min=  187.12 
    3737Initiating PH iteration=15 
    38 Convergence metric=      0.0113  First stage cost avg= 163132.6195  Max-Min=  101.81 
     38Convergence metric=      0.0186  First stage cost avg= 163205.7981  Max-Min=   76.97 
    3939Initiating PH iteration=16 
    40 Convergence metric=      0.0072  First stage cost avg= 163148.0832  Max-Min=  101.81 
     40Convergence metric=      0.0197  First stage cost avg= 163220.6080  Max-Min=  101.48 
    4141Initiating PH iteration=17 
    42 Convergence metric=      0.0103  First stage cost avg= 163242.1216  Max-Min=  210.01 
     42Convergence metric=      0.0104  First stage cost avg= 163281.7653  Max-Min=  136.90 
    4343Initiating PH iteration=18 
    44 Convergence metric=      0.0101  First stage cost avg= 163299.5835  Max-Min=  186.66 
     44Convergence metric=      0.0117  First stage cost avg= 163317.4997  Max-Min=  133.96 
    4545Initiating PH iteration=19 
    4646Fixing variable=ProduceSizeFirstStage[2] at tree node=RootNode to value=0; converged for 20 iterations 
     
    4949Fixing variable=ProduceSizeFirstStage[5] at tree node=RootNode to value=1; converged for 20 iterations 
    5050Fixing variable=ProduceSizeFirstStage[6] at tree node=RootNode to value=1; converged for 20 iterations 
    51 Convergence metric=      0.0106  First stage cost avg= 163306.4408  Max-Min=  186.66 
     51Convergence metric=      0.0146  First stage cost avg= 163321.1309  Max-Min=  133.96 
    5252Initiating PH iteration=20 
    5353Fixing variable=ProduceSizeFirstStage[7] at tree node=RootNode to value=1; converged for 20 iterations 
    54 Convergence metric=      0.0546  First stage cost avg= 163366.8888  Max-Min=  100.73 
     54Convergence metric=      0.0721  First stage cost avg= 163374.6616  Max-Min=  103.52 
    5555Initiating PH iteration=21 
    5656Fixing variable=ProduceSizeFirstStage[8] at tree node=RootNode to value=1; converged for 20 iterations 
    5757Fixing variable=ProduceSizeFirstStage[9] at tree node=RootNode to value=1; converged for 20 iterations 
    58 Convergence metric=      0.0366  First stage cost avg= 163403.9117  Max-Min=   51.03 
     58Convergence metric=      0.0546  First stage cost avg= 163409.2987  Max-Min=   56.07 
    5959Initiating PH iteration=22 
    60 Convergence metric=      0.0362  First stage cost avg= 163413.0187  Max-Min=   66.44 
     60Convergence metric=      0.0547  First stage cost avg= 163414.6509  Max-Min=   72.12 
    6161Initiating PH iteration=23 
    62 Convergence metric=      0.0361  First stage cost avg= 163406.9957  Max-Min=   49.58 
     62Convergence metric=      0.0545  First stage cost avg= 163406.1968  Max-Min=   55.67 
    6363Initiating PH iteration=24 
    64 Convergence metric=      0.0360  First stage cost avg= 163400.0997  Max-Min=   49.58 
     64Convergence metric=      0.0740  First stage cost avg= 163407.3173  Max-Min=   82.17 
    6565Initiating PH iteration=25 
    66 Convergence metric=      0.0004  First stage cost avg= 163367.9464  Max-Min=   55.29 
     66Convergence metric=      0.0554  First stage cost avg= 163394.2120  Max-Min=   38.52 
    6767Initiating PH iteration=26 
    68 Convergence metric=      0.0003  First stage cost avg= 163345.8459  Max-Min=   47.75 
     68Convergence metric=      0.0358  First stage cost avg= 163344.0437  Max-Min=  104.67 
    6969Initiating PH iteration=27 
    70 Convergence metric=      0.0004  First stage cost avg= 163336.7637  Max-Min=   61.36 
     70Convergence metric=      0.0182  First stage cost avg= 163316.7880  Max-Min=   86.98 
    7171Initiating PH iteration=28 
    72 Convergence metric=      0.0004  First stage cost avg= 163340.1747  Max-Min=   56.65 
     72Convergence metric=      0.0183  First stage cost avg= 163314.7816  Max-Min=   88.71 
    7373Initiating PH iteration=29 
    7474Fixing variable=NumProducedFirstStage[1] at tree node=RootNode to value=0; converged for 30 iterations 
    7575Fixing variable=NumProducedFirstStage[2] at tree node=RootNode to value=0; converged for 30 iterations 
    7676Fixing variable=NumProducedFirstStage[4] at tree node=RootNode to value=0; converged for 30 iterations 
    77 Convergence metric=      0.0002  First stage cost avg= 163349.9803  Max-Min=   42.33 
     77Convergence metric=      0.0181  First stage cost avg= 163329.8165  Max-Min=   67.85 
    7878Initiating PH iteration=30 
    79 Convergence metric=      0.0000  First stage cost avg= 163360.8664  Max-Min=   24.82 
     79Convergence metric=      0.0179  First stage cost avg= 163350.3123  Max-Min=   38.00 
     80Initiating PH iteration=31 
     81Convergence metric=      0.0001  First stage cost avg= 163365.7328  Max-Min=   17.74 
    8082PH converged - convergence metric is below threshold=0.0001 or all discrete variables are fixed 
    8183PH complete 
     
    8688     2             0.1617 
    8789     3             0.0644 
    88      4             0.0349 
     90     4             0.0348 
    8991     5             0.0963 
    9092     6             0.0103 
     
    9294     8             0.0067 
    9395     9             0.0084 
    94     10             0.0082 
     96    10             0.0083 
    9597    11             0.0289 
    96     12             0.0265 
    97     13             0.0021 
    98     14             0.0116 
    99     15             0.0113 
    100     16             0.0072 
    101     17             0.0103 
    102     18             0.0101 
    103     19             0.0106 
    104     20             0.0546 
    105     21             0.0366 
    106     22             0.0362 
    107     23             0.0361 
    108     24             0.0360 
    109     25             0.0004 
    110     26             0.0003 
    111     27             0.0004 
    112     28             0.0004 
    113     29             0.0002 
    114     30             0.0000 
     98    12             0.0269 
     99    13             0.0315 
     100    14             0.0266 
     101    15             0.0186 
     102    16             0.0197 
     103    17             0.0104 
     104    18             0.0117 
     105    19             0.0146 
     106    20             0.0721 
     107    21             0.0546 
     108    22             0.0547 
     109    23             0.0545 
     110    24             0.0740 
     111    25             0.0554 
     112    26             0.0358 
     113    27             0.0182 
     114    28             0.0183 
     115    29             0.0181 
     116    30             0.0179 
     117    31             0.0001 
    115118 
    116119*********************************************************************************************** 
    117 >>>THE EXPECTED SUM OF THE STAGE COST VARIABLES=224919.160567<<< 
     120>>>THE EXPECTED SUM OF THE STAGE COST VARIABLES=224919.0443<<< 
    118121>>>***WARNING***: Assumes full (or nearly so) convergence of scenario solutions at each node in the scenario tree - computed costs are invalid otherwise<<< 
    119122*********************************************************************************************** 
     
    130133                                Values:    12500.0000   12500.0000   12500.0000     Max-Min=      0.0000     Avg=  12500.0000  
    131134                        Index: [5,4]             (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    132                                 Values:     9656.0000    9657.0000    9655.0000     Max-Min=      2.0000     Avg=   9656.0000  
     135                                Values:     9656.0000    9654.0000    9658.0000     Max-Min=      4.0000     Avg=   9656.0000  
    133136                        Index: [5,5]             (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    134137                                Values:    35000.0000   35000.0000   35000.0000     Max-Min=      0.0000     Avg=  35000.0000  
     
    136139                                Values:    25000.0000   25000.0000   25000.0000     Max-Min=      0.0000     Avg=  25000.0000  
    137140                        Index: [7,4]             (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    138                                 Values:      344.0000     343.0000     345.0000     Max-Min=      2.0000     Avg=    344.0000  
     141                                Values:      344.0000     346.0000     342.0000     Max-Min=      4.0000     Avg=    344.0000  
    139142                        Index: [7,7]             (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    140143                                Values:    15000.0000   15000.0000   15000.0000     Max-Min=      0.0000     Avg=  15000.0000  
     
    142145                                Values:    12500.0000   12500.0000   12500.0000     Max-Min=      0.0000     Avg=  12500.0000  
    143146                        Index: [9,9]             (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    144                                 Values:     6409.0000    6409.0000    6409.0000     Max-Min=      0.0000     Avg=   6409.0000  
     147                                Values:     6411.0000    6410.0000    6411.0000     Max-Min=      1.0000     Avg=   6410.6667  
    145148                        Index: [10,9]            (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    146                                 Values:     6091.0000    6091.0000    6091.0000     Max-Min=      0.0000     Avg=   6091.0000  
     149                                Values:     6089.0000    6090.0000    6089.0000     Max-Min=      1.0000     Avg=   6089.3333  
    147150                        Index: [10,10]           (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    148151                                Values:     5000.0000    5000.0000    5000.0000     Max-Min=      0.0000     Avg=   5000.0000  
    149152                Variable=NumProducedFirstStage 
    150153                        Index: [3]               (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    151                                 Values:    38250.0000   38277.0000   38263.0000     Max-Min=     27.0000     Avg=  38263.3333  
     154                                Values:    38250.0000   38276.0000   38263.0000     Max-Min=     26.0000     Avg=  38263.0000  
    152155                        Index: [5]               (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    153                                 Values:    44656.0000   44657.0000   44655.0000     Max-Min=      2.0000     Avg=  44656.0000  
     156                                Values:    44656.0000   44654.0000   44658.0000     Max-Min=      4.0000     Avg=  44656.0000  
    154157                        Index: [6]               (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    155                                 Values:    38744.0000   38745.0000   38744.0000     Max-Min=      1.0000     Avg=  38744.3333  
     158                                Values:    38750.0000   38744.0000   38750.0000     Max-Min=      6.0000     Avg=  38748.0000  
    156159                        Index: [7]               (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    157                                 Values:    17783.0000   17783.0000   17783.0000     Max-Min=      0.0000     Avg=  17783.0000  
     160                                Values:    17777.0000   17785.0000   17780.0000     Max-Min=      8.0000     Avg=  17780.6667  
    158161                        Index: [8]               (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    159                                 Values:    22172.0000   22174.0000   22172.0000     Max-Min=      2.0000     Avg=  22172.6667  
     162                                Values:    22180.0000   22173.0000   22179.0000     Max-Min=      7.0000     Avg=  22177.3333  
    160163                        Index: [9]               (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    161                                 Values:    13079.0000   13080.0000   13079.0000     Max-Min=      1.0000     Avg=  13079.3333  
     164                                Values:    13081.0000   13079.0000   13083.0000     Max-Min=      4.0000     Avg=  13081.0000  
    162165                        Index: [10]              (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    163                                 Values:    24746.0000   24746.0000   24746.0000     Max-Min=      0.0000     Avg=  24746.0000  
     166                                Values:    24742.0000   24748.0000   24744.0000     Max-Min=      6.0000     Avg=  24744.6667  
    164167                Variable=ProduceSizeFirstStage 
    165168                        Index: [3]               (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
     
    179182                Cost Variable=FirstStageCost 
    180183                        Tree Node=RootNode               (Scenarios:  Scenario1   Scenario2   Scenario3   ) 
    181                         Values:   163349.5248  163374.3448  163358.7296     Max-Min=     24.8200     Avg= 163360.8664  
     184                        Values:   163354.3088  163372.0512  163370.8384     Max-Min=     17.7424     Avg= 163365.7328  
    182185Final costs: 
    183186Scenario Tree Costs 
     
    200203                Scenario2 
    201204                Scenario3 
    202         Expected node cost=224919.1606 
     205        Expected node cost=224919.0443 
    203206 
    204207        Name=Scenario1Node 
     
    210213        Scenarios: 
    211214                Scenario1 
    212         Expected node cost=28244.7504 
     215        Expected node cost=28239.9984 
    213216 
    214217        Name=Scenario2Node 
     
    220223        Scenarios: 
    221224                Scenario2 
    222         Expected node cost=61365.4368 
     225        Expected node cost=61367.8792 
    223226 
    224227        Name=Scenario3Node 
     
    230233        Scenarios: 
    231234                Scenario3 
    232         Expected node cost=95098.7200 
     235        Expected node cost=95086.3288 
    233236 
    234237---------------------------------------------------- 
     
    241244                RootNode 
    242245                Scenario1Node 
    243         Stage=          FirstStage     Cost=163349.5248 
    244         Stage=         SecondStage     Cost=28244.7504 
    245         Total scenario cost=191594.2752 
     246        Stage=          FirstStage     Cost=163354.3088 
     247        Stage=         SecondStage     Cost=28239.9984 
     248        Total scenario cost=191594.3072 
    246249 
    247250        Name=Scenario2 
     
    251254                RootNode 
    252255                Scenario2Node 
    253         Stage=          FirstStage     Cost=163374.3448 
    254         Stage=         SecondStage     Cost=61365.4368 
    255         Total scenario cost=224739.7816 
     256        Stage=          FirstStage     Cost=163372.0512 
     257        Stage=         SecondStage     Cost=61367.8792 
     258        Total scenario cost=224739.9304 
    256259 
    257260        Name=Scenario3 
     
    261264                RootNode 
    262265                Scenario3Node 
    263         Stage=          FirstStage     Cost=163358.7296 
    264         Stage=         SecondStage     Cost=95098.7200 
    265         Total scenario cost=258457.4496 
    266  
    267 ---------------------------------------------------- 
    268  
    269 Total PH execution time=78.85 seconds 
    270  
    271 Total execution time=78.85 seconds 
     266        Stage=          FirstStage     Cost=163370.8384 
     267        Stage=         SecondStage     Cost=95086.3288 
     268        Total scenario cost=258457.1672 
     269 
     270---------------------------------------------------- 
     271 
     272Total PH execution time=177.12 seconds 
     273 
     274Total execution time=177.12 seconds 
Note: See TracChangeset for help on using the changeset viewer.