source: coopr.pysp/trunk/coopr/pysp/tests/unit/sizes3_quadratic_cplex.baseline @ 5139

Revision 5139, 13.2 KB checked in by jwatson, 3 years ago (diff)

Fixing PySP CPLEX test baselines, accounting for verbose output enhancements.

Line 
1Executing user rho set script from filename=/home/jwatson/sp/coopr/src/coopr.pysp/examples/pysp/sizes/config/rhosetter.cfg
2WW PH Extension: Loading user-specified configuration from file=/home/jwatson/sp/coopr/src/coopr.pysp/examples/pysp/sizes/config/wwph.cfg
3WW PH Extension: Loading variable suffixes from file=/home/jwatson/sp/coopr/src/coopr.pysp/examples/pysp/sizes/config/wwph.suffixes
4Starting PH
5Initiating PH iteration=0
6Fixing variable=ProduceSizeFirstStage[1] at tree node=RootNode to value=0; converged for 1 iterations
7Fixing variable=ProduceSizeFirstStage[10] at tree node=RootNode to value=1; converged for 1 iterations
8Convergence metric=      0.1605  First stage cost avg= 163129.3437  Max-Min=  703.97
9Initiating PH iteration=1
10Convergence metric=      0.2124  First stage cost avg= 163280.7453  Max-Min= 1047.27
11Initiating PH iteration=2
12Convergence metric=      0.1617  First stage cost avg= 163361.6211  Max-Min=  488.95
13Initiating PH iteration=3
14Convergence metric=      0.0644  First stage cost avg= 163123.9867  Max-Min=   51.24
15Initiating PH iteration=4
16Convergence metric=      0.0348  First stage cost avg= 163063.7597  Max-Min=  485.32
17Initiating PH iteration=5
18Convergence metric=      0.0963  First stage cost avg= 163077.5445  Max-Min=  198.90
19Initiating PH iteration=6
20Convergence metric=      0.0103  First stage cost avg= 163096.2245  Max-Min=  219.51
21Initiating PH iteration=7
22Convergence metric=      0.0072  First stage cost avg= 163062.6547  Max-Min=  347.48
23Initiating PH iteration=8
24Convergence metric=      0.0067  First stage cost avg= 163032.5771  Max-Min=  347.48
25Initiating PH iteration=9
26Convergence metric=      0.0084  First stage cost avg= 163105.0475  Max-Min=  443.52
27Initiating PH iteration=10
28Convergence metric=      0.0083  First stage cost avg= 163163.5584  Max-Min=  443.52
29Initiating PH iteration=11
30Convergence metric=      0.0289  First stage cost avg= 163162.0685  Max-Min=  221.67
31Initiating PH iteration=12
32Convergence metric=      0.0269  First stage cost avg= 163114.0403  Max-Min=  140.43
33Initiating PH iteration=13
34Convergence metric=      0.0315  First stage cost avg= 163082.7963  Max-Min=  140.43
35Initiating PH iteration=14
36Convergence metric=      0.0266  First stage cost avg= 163150.0627  Max-Min=  187.12
37Initiating PH iteration=15
38Convergence metric=      0.0186  First stage cost avg= 163205.7981  Max-Min=   76.97
39Initiating PH iteration=16
40Convergence metric=      0.0197  First stage cost avg= 163220.6080  Max-Min=  101.48
41Initiating PH iteration=17
42Convergence metric=      0.0104  First stage cost avg= 163281.7653  Max-Min=  136.90
43Initiating PH iteration=18
44Convergence metric=      0.0117  First stage cost avg= 163317.4997  Max-Min=  133.96
45Initiating PH iteration=19
46Fixing variable=ProduceSizeFirstStage[2] at tree node=RootNode to value=0; converged for 20 iterations
47Fixing variable=ProduceSizeFirstStage[3] at tree node=RootNode to value=1; converged for 20 iterations
48Fixing variable=ProduceSizeFirstStage[4] at tree node=RootNode to value=0; converged for 20 iterations
49Fixing variable=ProduceSizeFirstStage[5] at tree node=RootNode to value=1; converged for 20 iterations
50Fixing variable=ProduceSizeFirstStage[6] at tree node=RootNode to value=1; converged for 20 iterations
51Convergence metric=      0.0146  First stage cost avg= 163321.1309  Max-Min=  133.96
52Initiating PH iteration=20
53Fixing variable=ProduceSizeFirstStage[7] at tree node=RootNode to value=1; converged for 20 iterations
54Convergence metric=      0.0721  First stage cost avg= 163374.6616  Max-Min=  103.52
55Initiating PH iteration=21
56Fixing variable=ProduceSizeFirstStage[8] at tree node=RootNode to value=1; converged for 20 iterations
57Fixing variable=ProduceSizeFirstStage[9] at tree node=RootNode to value=1; converged for 20 iterations
58Convergence metric=      0.0546  First stage cost avg= 163409.2987  Max-Min=   56.07
59Initiating PH iteration=22
60Convergence metric=      0.0547  First stage cost avg= 163414.6509  Max-Min=   72.12
61Initiating PH iteration=23
62Convergence metric=      0.0545  First stage cost avg= 163406.1968  Max-Min=   55.67
63Initiating PH iteration=24
64Convergence metric=      0.0740  First stage cost avg= 163407.3173  Max-Min=   82.17
65Initiating PH iteration=25
66Convergence metric=      0.0554  First stage cost avg= 163394.2120  Max-Min=   38.52
67Initiating PH iteration=26
68Convergence metric=      0.0358  First stage cost avg= 163344.0437  Max-Min=  104.67
69Initiating PH iteration=27
70Convergence metric=      0.0182  First stage cost avg= 163316.7880  Max-Min=   86.98
71Initiating PH iteration=28
72Convergence metric=      0.0183  First stage cost avg= 163314.7816  Max-Min=   88.71
73Initiating PH iteration=29
74Fixing variable=NumProducedFirstStage[1] at tree node=RootNode to value=0; converged for 30 iterations
75Fixing variable=NumProducedFirstStage[2] at tree node=RootNode to value=0; converged for 30 iterations
76Fixing variable=NumProducedFirstStage[4] at tree node=RootNode to value=0; converged for 30 iterations
77Convergence metric=      0.0181  First stage cost avg= 163329.8165  Max-Min=   67.85
78Initiating PH iteration=30
79Convergence metric=      0.0179  First stage cost avg= 163350.3123  Max-Min=   38.00
80Initiating PH iteration=31
81Convergence metric=      0.0001  First stage cost avg= 163365.7328  Max-Min=   17.74
82PH converged - convergence metric is below threshold=0.0001 or all discrete variables are fixed
83PH complete
84Convergence history:
85Iteration    Metric Value
86     0             0.1605
87     1             0.2124
88     2             0.1617
89     3             0.0644
90     4             0.0348
91     5             0.0963
92     6             0.0103
93     7             0.0072
94     8             0.0067
95     9             0.0084
96    10             0.0083
97    11             0.0289
98    12             0.0269
99    13             0.0315
100    14             0.0266
101    15             0.0186
102    16             0.0197
103    17             0.0104
104    18             0.0117
105    19             0.0146
106    20             0.0721
107    21             0.0546
108    22             0.0547
109    23             0.0545
110    24             0.0740
111    25             0.0554
112    26             0.0358
113    27             0.0182
114    28             0.0183
115    29             0.0181
116    30             0.0179
117    31             0.0001
118
119***********************************************************************************************
120>>>THE EXPECTED SUM OF THE STAGE COST VARIABLES=224919.0443<<<
121>>>***WARNING***: Assumes full (or nearly so) convergence of scenario solutions at each node in the scenario tree - computed costs are invalid otherwise<<<
122***********************************************************************************************
123Final number of discrete variables fixed=13 (total=75)
124Final number of continuous variables fixed=0 (total=0)
125Final variable values:
126        Stage=FirstStage
127                Variable=NumUnitsCutFirstStage
128                        Index: [3,1]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
129                                Values:     2500.0000    2500.0000    2500.0000     Max-Min=      0.0000     Avg=   2500.0000
130                        Index: [3,2]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
131                                Values:     7500.0000    7500.0000    7500.0000     Max-Min=      0.0000     Avg=   7500.0000
132                        Index: [3,3]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
133                                Values:    12500.0000   12500.0000   12500.0000     Max-Min=      0.0000     Avg=  12500.0000
134                        Index: [5,4]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
135                                Values:     9656.0000    9654.0000    9658.0000     Max-Min=      4.0000     Avg=   9656.0000
136                        Index: [5,5]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
137                                Values:    35000.0000   35000.0000   35000.0000     Max-Min=      0.0000     Avg=  35000.0000
138                        Index: [6,6]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
139                                Values:    25000.0000   25000.0000   25000.0000     Max-Min=      0.0000     Avg=  25000.0000
140                        Index: [7,4]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
141                                Values:      344.0000     346.0000     342.0000     Max-Min=      4.0000     Avg=    344.0000
142                        Index: [7,7]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
143                                Values:    15000.0000   15000.0000   15000.0000     Max-Min=      0.0000     Avg=  15000.0000
144                        Index: [8,8]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
145                                Values:    12500.0000   12500.0000   12500.0000     Max-Min=      0.0000     Avg=  12500.0000
146                        Index: [9,9]             (Scenarios:  Scenario1   Scenario2   Scenario3   )
147                                Values:     6411.0000    6410.0000    6411.0000     Max-Min=      1.0000     Avg=   6410.6667
148                        Index: [10,9]            (Scenarios:  Scenario1   Scenario2   Scenario3   )
149                                Values:     6089.0000    6090.0000    6089.0000     Max-Min=      1.0000     Avg=   6089.3333
150                        Index: [10,10]           (Scenarios:  Scenario1   Scenario2   Scenario3   )
151                                Values:     5000.0000    5000.0000    5000.0000     Max-Min=      0.0000     Avg=   5000.0000
152                Variable=NumProducedFirstStage
153                        Index: [3]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
154                                Values:    38250.0000   38276.0000   38263.0000     Max-Min=     26.0000     Avg=  38263.0000
155                        Index: [5]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
156                                Values:    44656.0000   44654.0000   44658.0000     Max-Min=      4.0000     Avg=  44656.0000
157                        Index: [6]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
158                                Values:    38750.0000   38744.0000   38750.0000     Max-Min=      6.0000     Avg=  38748.0000
159                        Index: [7]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
160                                Values:    17777.0000   17785.0000   17780.0000     Max-Min=      8.0000     Avg=  17780.6667
161                        Index: [8]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
162                                Values:    22180.0000   22173.0000   22179.0000     Max-Min=      7.0000     Avg=  22177.3333
163                        Index: [9]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
164                                Values:    13081.0000   13079.0000   13083.0000     Max-Min=      4.0000     Avg=  13081.0000
165                        Index: [10]              (Scenarios:  Scenario1   Scenario2   Scenario3   )
166                                Values:    24742.0000   24748.0000   24744.0000     Max-Min=      6.0000     Avg=  24744.6667
167                Variable=ProduceSizeFirstStage
168                        Index: [3]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
169                                Values:        1.0000       1.0000       1.0000     Max-Min=      0.0000     Avg=      1.0000
170                        Index: [5]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
171                                Values:        1.0000       1.0000       1.0000     Max-Min=      0.0000     Avg=      1.0000
172                        Index: [6]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
173                                Values:        1.0000       1.0000       1.0000     Max-Min=      0.0000     Avg=      1.0000
174                        Index: [7]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
175                                Values:        1.0000       1.0000       1.0000     Max-Min=      0.0000     Avg=      1.0000
176                        Index: [8]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
177                                Values:        1.0000       1.0000       1.0000     Max-Min=      0.0000     Avg=      1.0000
178                        Index: [9]               (Scenarios:  Scenario1   Scenario2   Scenario3   )
179                                Values:        1.0000       1.0000       1.0000     Max-Min=      0.0000     Avg=      1.0000
180                        Index: [10]              (Scenarios:  Scenario1   Scenario2   Scenario3   )
181                                Values:        1.0000       1.0000       1.0000     Max-Min=      0.0000     Avg=      1.0000
182                Cost Variable=FirstStageCost
183                        Tree Node=RootNode               (Scenarios:  Scenario1   Scenario2   Scenario3   )
184                        Values:   163354.3088  163372.0512  163370.8384     Max-Min=     17.7424     Avg= 163365.7328
185Final costs:
186Scenario Tree Costs
187***WARNING***: Assumes full (or nearly so) convergence of scenario solutions at each node in the scenario tree - computed costs are invalid otherwise
188----------------------------------------------------
189Model=unknown
190----------------------------------------------------
191Tree Nodes:
192
193        Name=RootNode
194        Stage=FirstStage
195        Parent=None
196        Conditional probability=1.0000
197        Children:
198                Scenario1Node
199                Scenario2Node
200                Scenario3Node
201        Scenarios:
202                Scenario1
203                Scenario2
204                Scenario3
205        Expected node cost=224919.0443
206
207        Name=Scenario1Node
208        Stage=SecondStage
209        Parent=RootNode
210        Conditional probability=0.3333
211        Children:
212                None
213        Scenarios:
214                Scenario1
215        Expected node cost=28239.9984
216
217        Name=Scenario2Node
218        Stage=SecondStage
219        Parent=RootNode
220        Conditional probability=0.3333
221        Children:
222                None
223        Scenarios:
224                Scenario2
225        Expected node cost=61367.8792
226
227        Name=Scenario3Node
228        Stage=SecondStage
229        Parent=RootNode
230        Conditional probability=0.3333
231        Children:
232                None
233        Scenarios:
234                Scenario3
235        Expected node cost=95086.3288
236
237----------------------------------------------------
238Scenarios:
239
240        Name=Scenario1
241        Probability=0.3333
242        Leaf Node=Scenario1Node
243        Tree node sequence:
244                RootNode
245                Scenario1Node
246        Stage=          FirstStage     Cost=163354.3088
247        Stage=         SecondStage     Cost=28239.9984
248        Total scenario cost=191594.3072
249
250        Name=Scenario2
251        Probability=0.3333
252        Leaf Node=Scenario2Node
253        Tree node sequence:
254                RootNode
255                Scenario2Node
256        Stage=          FirstStage     Cost=163372.0512
257        Stage=         SecondStage     Cost=61367.8792
258        Total scenario cost=224739.9304
259
260        Name=Scenario3
261        Probability=0.3333
262        Leaf Node=Scenario3Node
263        Tree node sequence:
264                RootNode
265                Scenario3Node
266        Stage=          FirstStage     Cost=163370.8384
267        Stage=         SecondStage     Cost=95086.3288
268        Total scenario cost=258457.1672
269
270----------------------------------------------------
271
272Total PH execution time=177.12 seconds
273
274Total execution time=177.12 seconds
Note: See TracBrowser for help on using the repository browser.